Schweiz
Schweiz

myGeobrugg

Réotier, Versant de Mensolles

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Before installation of the protecting solution

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide (SL-150) barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of SL-150 barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

During installation of the SL-150 barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of the Low water channel made of blocks set in concrete

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of a foundation block at the foot of a post

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of an end post

 

Systeme

 

Systemlänge

42 m

 

Installationsjahr

2024

Situation

Following an exceptional rainfall event in November 2023, a mudslide mobilizing a volume of around 600 to 800 m³ reached and covered the rail track over a distance of more than 30 meters. As a result of this event, the railway line was interrupted and restricted for several months. The Mensolles slope had to be secured against the residual volumes of material that could potentially be remobilized following the event.

Massnahme

Geobrugg assisted the SNCF with the design and supervision of a 42-meter-long mudflow barrier.

The central part of the barrier was completed by a wide masonry ditch to channel the flow of almost permanent runoff water to a hydraulic structure at the track level.


The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Mensolles slope since December 2023 were withdrawn early in July 2024 before the summer season.

Land/Region

Frankreich

Kunde

Planer

SNCF Réseau

Generalunternehmer

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail