Switzerland
Switzerland

myGeobrugg

Slope Stability - Oštarije-Gospić-Knin-Split, Railway M604 2025

The protected railway line near Trogir

Slope Stability - Oštarije-Gospić-Knin-Split, Railway M604 2025

Overview rockfall protection

Slope Stability - Oštarije-Gospić-Knin-Split, Railway M604 2025

Slope stabilization and rockfall protection combined at the crucial point

Slope Stability - Oštarije-Gospić-Knin-Split, Railway M604 2025

Inspection of the safety installations holding back rockfall and preventing it; the rockfall barrier is four meters high

 
 

Year of installation

2025

Situation

Frequent rockfalls on this vital traffic link between Dalmatia and the rest of the country often caused delays.

Description

An active stabilization with TECCO® G65/3 and a GBE-500A rockfall protection barrier considerably enhance the safety of the railway line. 

Country/Region

Croatia

Contractor

Protected object

Railway

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail