myGeobrugg
The customer required a reliable solution that would ensure the strength of the end modules. The ROCCO rockfall barrier meets these requirements and even exceeds the requirements of the current gui
Sixty meters of mobile debris fence were installed in front of a platform on the service road inside of turn 1.
An additional 32 meters of mobile debris fence were installed on the outside
Geobrugg supplied high tensile strength mesh with an 80 mm mesh opening and 2 mm wire diameter - DELTAX G80/2. This mesh offers a valuable advantage in handling the installation (lightweight rolls)
In a short time, the block weighing almost 500 tons was stabilized with 32 wire ropes (22 mm GEOBINEX). These ropes were firmly anchored on the grassland above with 350 meters of spiral rope anchor
Fifteen new Pit Wall barriers were added and connected to the end of the existing Pit Wall. The client opted for our smaller 1.5-meter platform. We had a special transition element designed for a s
Geobrugg delivered 92 meters of the FIA homologated mobile debris fence consisting of a concrete barrier and a debris fence panel.
The advantage of the Geobrugg system is, next to
Our U-shaped concrete barriers, designed to hold our debris fence panels, have been placed at seven marshal post locations. In addition, one marshal post system has been adapted to protect the tv c
Geobrugg introduced the Geobrugg GUARD to both the Port and the designer (Jubb) and highlighted the potential for the corrosion data it provides to be used to undertake more accurate lifetime calcu
Different debris fence solutions were chosen:
Geobrugg worked closely with Abu Dhabi Motorsports Management (ADMM) and delivered more than 700 meters of the FIA homologated debris fence system. Our permanent debris fence system wa...
160 meters of Geobrugg’s homologated mobile debris fence were installed at Turn 20.
The first works were done on the Old Gardiner Road Bypass at Mammoth Hot Springs, where damage at the Park’s North Entrance, cut off access to Gardiner, Montana. Approximately 20,000 square f...
Six Geobrugg flexible debris flow nets have been installed in San Ysidro, Buena Vista, and Cold Springs Canyons. The construction was closely monitored by a supervising biologist, a geologist, and
Working with Kent & Sussex Geotechnical, we assisted in assessing options for the stablisation of the rockface. Due to the anticipated atmospheric corrosion on site, a stainless steel stablisat
The measures included rock cleaning, net covers, the installation of rockfall protection structures, the permanent tie-back of rock sections and the construction of concrete support piers.
Together with the company Geobrugg, 31 GUARD devices were installed: in the Upper and Lower Engadine and Poschiavo (Puschlav). The actual installation time is a few minutes in each case. The journe
The installation of a Geoprevent DEFOX® Deformation Camera allowed to distinguish stable areas from unstable areas. The pictures delivered important information a...
Geobrugg Motorsport supplied the mobile debris fence system for the Mandalik
In 2021 Geobrugg was awarded by South Florida Motorsport to supply the FIA homologated safety barriers systems required for the F1 Grand Prix in Miami/Florida. Geobrugg supplied the entire circuit
The first stage of the solution involved emergency works to stabilise the area of unravelling, this included a small area of meshing and rock bolting as well as backfilling of the voided shotcrete
The safety works involved using DELTAX mesh to consolidate the portions of the rock walls located at lower altitudes. Rockfall protection barriers GBE-500A and GBE-1000A, capable of dissipating 500