The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas be...
Stabilization with TECCO® G65/3 System The net was anchored with 32 mm GEWI-type bars; 9 meters at the top, 6 meters at the bottom of the slope, with a 2 m x 2 m grid. The project was configured wi...
It was decided to install a high-performance protection and stabilization system in five areas.
As there were no indications of global stability problems, this was considered satisfying, so
The importance of the A7 MI-GE highway required the adoption of a particularly efficient consolidation system in the short, medium and long term. In this sense, Società Autostrade per l'Italia cont...
On behalf of the company Ecogrid srl of Calizzano (SV), an intervention aimed at identifying a consolidation system to secure the landslide mechanism at the Municipality of Noli was proposed. The s
Geobrugg specialists used the RUVOLUM software for the design and applied SPIDER® System to stabilize the blocks around the pipeline. Rock nails GEWI 28 mm were used to fix the net.
Working with Kent & Sussex Geotechnical, we assisted in assessing options for the stablisation of the rockface. Due to the anticipated atmospheric corrosion on site, a stainless steel stablisat
A key feature of the solution was to significantly improve surface and underground drainage. Geobrugg's RUVOLUM® software was used to ensure the correct system materials/products were chosen and th...
The consortium of Pioneer Foundation Engineers and Geobrugg AG was awarded the work for providing rockfall protection solutions using SPIDER® System providing active rock mass stabilization. The SP...
The anchored TECCO