Arlberg Mountain Pass - road connection Rauz-Stuben

In 2011, a feasibility study was conducted into rerouting the road. In 2014, the Austrian state of Voralberg began the construction of five hairpin bends with a length of 1.3 km and at a cost of ar

Sendall Tunnel

The designer decided to install high tensile TECCO® G65/3 mesh as a drape due to it's unique features, low maintenance requirements and corrosion protection.

As a direction protection of th...

Cockermouth Castle

In conjunction with the geotechnical contractor, who had already decided the slope needed soil nailing and TECCO® System, we looked to optimise the solution for the fine grained nature of the soil....

Route Chalais-Vercorin, Valais

On the link road Chalais to Vercorin, the self-cleaning rockfall protection solution Canopy SCC-500 has been implemented for maximum energies up to 500 kJ.

Due to the extremely steep terrai

A1 Highway Pyrzowice-Piekary Śląskie

For the following reasons designers together with the Polish National Roads selected TECCO® System as a stabilizing solution:

  •  complicated ground conditions – about 12 geotechnical l...
Kanmantoo Copper Mine

Geobrugg has worked closely with the mine and the installation contractor to manage a range of rockfall hazards. To date, approximately 45,000m² of DELTAX®, MINAX®, and TECCO® drape mesh have been...

Olt Valley, km 198+000 - 226+000 - Slope

TECCO® SYSTEM³ was provided as an active protection measure on the following sectors:

1. km 198+523.72 - 198+571.00

TECCO® G65/3 mm

  • surface:...
Valjevo-Resnik, Serbia

Designers from CIP Belgrade, Marina Janković, and Ivana Vujović together with the assistance of Geobrugg's Representative Office in Croatia provided stabilizing solutions for 11 slopes. Problems of...

Grüner See - Schmiedewalde

Approximately 50 m of the slope was stabilized from an average height of 10 m (vertical extension). The high-tensile TECCO® GREEN G65/3 mesh was anchored to the slope with approximately 130 soil na...

Mühlehorn, Highway A3, Glarus Nord

This description shows the part stabilized with TECCO® System. A parallel project, Kerenzerberg Hig...

Wägitalstrasse

In order to protect the road from further landslides, approx. 500 m² of TECCO® System have been installed. TECCO® G65/3 mesh made out of high-strength steel wire was fastened with self-drilling anc...

Tres Reyes

The areas at higher risk were identified and two types of solutions were ...

Schwieberdingen

The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas be...

Galerie Maachi - BLS

The office of Geoplan AG, Steg, VS was commissioned by the BLS AG to draw up immediate measures for securing the erosion slope and also the gallery.

The best option provides for the followi

Perez Caldera

The solution defined was installing TECCO GREEN - a mesh system with an erosion control mat- to stabilize, minimize the environmental impact, avoid using shotcrete and allow the revegetation of the

Schwarzenberg Murgtal Rappenriss

To protect the road and the bike path

Deining, Deutsche Bahn (German Railway)

500 meters of rockface was actively stabilized using TECCO® System and DELTAX® G80/2 mesh.  Both solutions were installed without railway line interruption.

Laúca Hydro Power Plant

The following solutions were used for slope protection:

Top of the cliffs and tower shaped structures partially protected with TECCO® System:

  • high tensile mesh: TECC...
Castle of Laufen, Rhine Falls, Schaffhausen

The Rhine Falls are one of the most frequently visited tourist sites in Switzerland. Consequently, the stabilization work had to occur: During low-volume visitation hours keeping the access blocked...

El Florido - Los Ranchos. Km 36.1

The Consulter decided stabilize the slope using TECCO GREEN G65-3 system with nails of  nails L=12 m on bottom middle of slope (critical area).

Kirkel-Limbach railway line

The slope was stabilized with high tensile TECCO® SYSTEM³ in combination with nailing: Ischebeck TITAN 30/11, lenght 3 to 4 meters, nailing pattern between 1.5 m x 1.5 m and 2.0 m x 2.0 m.

Castello di San Terenzo

As a solution active slope stabilization with nailing and TECCO® System was applied (with a smaller mesh opening band at the top). With a slope ra...

T-350 Road / Valdivia

Geobrugg and MOP authorities proposed a slope stabilization with TECCO® System (soil nailing), combined with the TECMAT® erosion control mat for the greening of the embankment. Since then the stabi...

Tamina Bridge

During the construction phase, the Valenserstrasse had to be protected as an access road that later became the Tamina Bridge. The mesh which was i...

Lauter-Bernsbach I

Slope protection with TECCO® System; additionally  GBE-500A rockfall protection barrier has been installed.

See also the  San José Calderas Road 27, km 45.8

Active slope stabilization was implemented using TECCO® System anchored with 8 m threadbare nails in a pattern of  2.0 m by 2.0 m.

Plaza La Marquesa

Installaion of TECCO® SYSTEM wit G65/3 mesh, with anchor bars D28 mm, Grad 97 and a length of 5 meters

Quintero

Instead of rigid shotcrete to stabilize the surface layer, TECCO GREEN was installed. The system enables revegetation of the slope and reduces the visual and environm

Egnatia Odos Motorway, Peristeri

Replacement of old shotcrete slope cover with TECCO® G65/3 high tensile steel mesh, system spike plates and greening. The flexible facing proves to be much more efficient and safer for creeping slo...

La Entrada - Santa Rosa de Copán. Km152

To stabilize the blocks and to control the erosion on the lower layer TECCO® GREEN mesh with 6 m nails, a pattern of 2.3 x 2.3 m was installed.

Villeta Slope

The Corporacion Autonoma Regional de Cundinamarca, WARCO / Geobrugg supplied the material and accompanied the installation process of 2800 m² of TECCO® System G65/3 with erosion control mat TECMAT®...

Haigerloch K7177

Slopes were nailed and covered with TECCO® System.

Râul Alb hydropower plant

After analyzing the overall stability of the slope, an active nailed TECCO® System was chosen to protect a total area of 4200 m².

Bassin d'Antiquailles - Tranchée rocheuse

The exposed rock face has fractured planes that can generate local instability. TECCO system, consisting of a G65/3 mesh associated with a P33 spike plate, was selected.
The resistance of the

Cacheuta Tunnel - Mendoza - Road N°82

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 met...

Landesgartenschau Überlingen

TECCO 45/2 mesh has been installed. The GEWI nails have been given black protective caps in the areas next to the footpaths, and the threads have all been uniformly back-reamed. In addition, erosio

Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh

TECCO® SYSTEM³ was nailed by fully threaded rock-bolts, with minimum dia of 28 mm to a maximum of 40 mm and hot-dip galvanized. The nail pattern was variable with 1.9 x 1.9 m to a maximum of 2.4 x...

St. Johannes’s mine - underground tourist route

For the visitors' safety TECCO® was installed.

Schwäbisch Gmünd

For dimensioning the nail grid pattern global stability was observed and recorded first.<...

Olt Valley, km 239+500 - 246+500 - Slope

4200 m² of TECCO® System and 560 m² of SPIDER® System were installed together with nailing as an active protection measure on the following sectors:

1. km 240+421 - 240+441

Hagen Haiger Deutsche Bahn (German Railway)

Solution applied:

TECCO® mesh cover in combination with nailing

Nail distances: a x b = 2.0 m x 1.5 m

Nails: GEWI D = 25 mm

Nail inclination: 20°

Samphire Hoe in Dover

Working alongside Fairhurst - Consulting Structural and Civil Engineers of Glasgow CAN Geotechnical Ltd. undertook the installation of 13 individual Geobrugg rockfall barriers. The GBE range of bar...

Dodoni, Egnatia Odos Motorway

Geobrugg provided a stabilization system and design support consisting of:  SWIFT type  dia. 25 [mm] long soil nails, flexible high tensile facing made of TECCO® G65/3 and P33 system spike plates.<...

Montemar

Stabilization of this sector of the slope with the TECCO® SYSTEM G65/3 and anchors SAS 32 mm with a length of 6 meters.

Santillana

The consultant designed a stabilization with TECCO® G45/2, with anchors of 9 meters lengths and a distance of  3.5 meters.

Las Cumbres

The contractor offered a solution with the TECCO® G65/3 mesh. The mesh replaced the former shotcrete solution. The current system is a beautiful green solution.

Shimizu district North-South

For the restoration of the collapsed area, Kumonosu Net using high tensile steel wire mesh TECCO® System was selected taking into account the large number of installation results, reasonable design...

Rue Bombatsch N7 Marnach

To stabilize this slope and to prevent corrosion TECCO® G65/3 STAINLESS was chosen. This included stainless connection clips, stainless spike plates P33/40 N as well as a diameter 12 border rope, w...

Talud Paraíso

The protective installation for the people working at the tugboat port consists of

  • TECCO® G65/3
  • Anchors D28 mm, Grad 97, L=5 m., nailspattern 2x2 m
  • Erosion contro...
Teregova-Armeniș - CFR Romanian Railway

Together with the appointed designer we were invited to find a solution for the problem. After site investigation the slope stabilisation solution was chosen: soil nailing with flexible facing usin...

Trek route to Shri Mata Vaishno Devi Shrine (2)

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which...

Morlupo

Stabilization with TECCO® G65/3 System The net was anchored with 32 mm GEWI-type bars; 9 meters at the top, 6 meters at the bottom of the slope, with a 2 m x 2 m grid. The project was configured wi...

West St Leonards

Engineers Tony Gee and Partners set about designing a scheme for the full slope length. Due to the limited access at the crest, raised trunking, cable routes, signals at the base of the slope, and

Leonardo Aerospace Test Site Milan

To minimize the risk from debris in the event of a possible test failure, a protective structure was erected. The primary structure of supports and steel cables is roofed with two layers of TECCO G

Zion Hill

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

San José Calderas Road 27, km 47.75

TECCO® G65/3 STAINLESS was installed to protect the slope.

El Jocotillo electrical substation

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

Pescante Agulo

TECCO® Stainless consists of 3 mm stainless wire (1.4462 / AISI 318) high tensile strength (1'650MPa), all complementary fasteners and accessories are also made of stainless steel.This first of its...

Paseo San Nicolás

A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.

Praia de São Bernadino

The contractor installed a DELTAX® G80/2 mesh drape to steer the smaller blocks dow...

Point 17 - Highway Madden Colon

Installation of TECCO® G45/2 system with nails of 4 m length and nail separation 3.75 x 3.75 m.

Zagreb-Rijeka Railway Line - Tunnel Meja

When designer Vanja Kovačević received data from the geologist, he chose TECCO® G65/4 for this slope protection. TECCO® G65/4 was combined with 4 meters long self-drilling nails (32/21 mm) and 6 to...

Dallenwil Wiesenbergstrasse Lochgraben

In order to increase the drainage capacity of the channel below and prevent possible erosion in the foot area, a concrete channel was created at the foot of the embankment. The slope ar

Tengen K6132

Seven installations of TECCO® G65/3 and TECMAT® secure the overhanging structure of the slope today. Also, a 2 meters high gap-filling solution was erected on a rock outcrop. The protected slope he...

St. Märgen - Buchenbach L128

After dimensioning, the TECCO® System was installed with extra border ropes to secure and stabilize the surfaces that form the transitio...

Mesteacan - National Road 1C

The designing office asked Geobrugg to provide an alternative solution to retaining walls, a solution which also could be revegetated. TECCO® SYSTEM³ was chosen and dimensioned to stabilize a total...

Hydroelectric plant - Hidro-Ituango

Geobrugg has the only stainless steel stabilization system on the market, TECCO® STAINLESS. This system of stainless steel increases the life cycle and reduces susceptibility to corrosion.

...

Neahkanie Chasm

The Oregon Department of Transportation specified that a proprietary rockfal

Berchtesgaden (Bavaria), ice drape

Hinged supports guide the suspension cables. As a result, breaking ice masses fall behind the mesh and not onto the road.

Moreover, the ice «grows» through the network. When the ice detache...

Ringelaier Leite St 2127

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

...
Carrière de Michelau N27

The rockfall protection measures installed along the cliff are two RXI-500 Barriers:

  • Barrier RXI 500, Length 78 m, Height  5.5 m
  • Barrier RXI 500, Length 64 m, Height  7.0 m...
Clackamas Highway, Oregon, OR224

Through the design process Geobrugg provided technical support on various flexible rockfall mitigation systems.  The Engineering Geologists from the Oregon Department of Transportation chose to mit...

Olt Valley, km 198+000 - 226+000 - Rock

As passive protection measures, AXI and RXI rockfall barriers with dynamic capacity ranging from 500 to 3000 kJ were chosen for the following sectors:

1. km 198+523.72 - 198+571...

Löwenwand - German Railway (DB)

Lieferung des Materials

Periferiaki Road, Thessaloniki

Nailing together with flexible facing made out of TECCO® System was implemented.

PH Belen

Combined solution was implemented, including GBE rockfall barriers, shallow landslide barrier and active slope stabilization with TECCO® SYSTEM³ and DELTAX® mesh.

Canadian Malartic Mine CMM

Geobrugg worked closely with the mine and with Construction & Expertise PG as the installation contractor to manage the rockfall hazards. To date, approximately 33,000m² of TECCO® for about 450...

Portal Fusca

In the Portal del Fusca condominium, over 3'000 m² are protected by two kinds of meshes: TECCO® G65/3 in the very critical areas with falling blocks and GREENAX® drape in the sectors with superfici...

Railway Iseo - Edolo

During the execution phase, our technical department collaborated with the Nord_Ing bureau to place the project rockfall barriers directly on site.

In addition to the 31 GUARDs, we also sup

Egnatia Odos Motorway, Metsovo interchange

In order to minimize visual impact, all the slopes cut were executed with soil nails, TECCO® System and an anti-erosion mat for revegetation.

CADASA Rioseco

The protective solution combines different structures: TECCO Drape in the upper zone to direct the rocks towards an intermediate berm, where dynamic barriers of 1,000 kJ and different heights (GBE-

Jenolan Caves

A TECCO® slope stabilisation system was installed to control rock falls and shallow slumps on cut ID 14812, Jenolan Caves Road. The system covers a portion of the slope with TECCO® mesh anchored to...

Stromeferry Railway Station

We supplied TECCO G65/3 on short notice to a remote site in the Highlands. While working with the designer in the background, we ensured they had all the necessary technical data for their design.<

Piwniczna Zdrój DW971

A 70 meters long wall was secured with ground nails and a mesh - with TECCO® System.

The solution maintains the stability of the retaining wall without tearing down the old stone wall. T...

Cucunuba walking path

To enable a fast re-vegetation, TECCO® GREEN was installed. This system integrates a high resistance mesh and an erosion control mat. It significantly reduces installation time and enables a rapid...

Waiheke Island (2)

We installed SL-100 barriers to protect the properties from shallow landslides and rockfall. TECCO mesh was installed below the barrier to support the excavation cuts. TECMAT on one of the sites wa

Cucuta Pamplona Road

A cast iron structure was constructed with high-tensile steel wire mesh. TECCO® G65/3 mesh allows water to flow through the structure. At the same time, the material withstands the blocks transport...

Snuff Mills

A total number of 44 rock bolts and 4 anchors were installed at height into a sub-vertical to overhanging cliff. 420 m² of high tensile TECCO® G65/3 steel mesh was installed to work with the rock b...

Seoul Ring Expressway (No. 100)

In 2001, KHC (Korea Highway Corporation) decided to install a high strength, anchored steel, mesh system (new technology).  This system would stabilize a continually failing slope.  The installatio...

Kyle of Lochalsh Line

TECCO® G65/3 was used in conjunction with rockbolts to stabilise rock cuttings. Individual blocks were bolted in addition to the mesh which was contoured around the face and blocks.

Photos ...

Hemlo Mine

Geobrugg worked closely with the mine and the installation contractor GeoSta

Sumner Stainless

The support system selected was TECCO® STAINLESS G65/3 with stainless P33/40 spike plates. The advantages of the stainless TECCO® system are its corrosion resistance, low...

Highwall Southeastern USA

The solution implemented in the spring of 1996 was a 408 000 feet² TECCO® G65/4 Drape System. The challenge was providing a system strong enough to contain frequent rockfall from the 320 feet highw...

Franschhoek Pass

A key feature of the solution was to significantly improve surface and underground drainage. Geobrugg's RUVOLUM® software was used to ensure the correct system materials/products were chosen and th...

Kaikoura State Highway 1 (SR24/30)

The mesh selected was Tecco® G65/3 ULTRACOATING due to its strength properties, corrosion resistance, low visibility, uniform strength for anchor placement and general ease and speed of insta...

Selo Boyolali

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditio

Überlingen Blatterngraben / Uhlandhöhe

In spring 2016 the collapsed slope was stabilized with TECCO® System. TECMAT® was installed as a greening aid, so the slope is protected from erosion, plus the mesh is barely visible.

Festung Hohentwiel - Singen

Above the visitors' path between the arsenal (fortress above) and the service building (below), 190 m² of TECCO® System G65/3 with P66 spike plates were installed using GEWI-32 and titanium 40/16 n...

Alrosa Diamond Mine, Aykhal

One of the challenges was the delivery of material and drilling machinery to the site: In winter time you may use the ice road which runs along the river Lena.

In the summer material has to...

Baia Mare - Sighetul Marmaţiei

It was decided to install a high-performance protection and stabilization system in five areas.

As there were no indications of global stability problems, this was considered satisfying, so