Switzerland
Switzerland

myGeobrugg

Rockfall Protection - Seehorn Davos 2022

The Flüela pass road: again protected from rockfall and avalanches

Rockfall Protection - Seehorn Davos 2022

Delivery of the supports and nets by helicopter

Rockfall Protection - Seehorn Davos 2022

The pre-installed ringnet can be drawn like a curtain

Rockfall Protection - Seehorn Davos 2022

Completely installed rockfall and avalanche protection barrier

 

Systems

Special Solutions Geobrugg GUARD

 

System length

44 m

 

Year of installation

2022

Situation

A 30-year-old barrier was severely damaged by rockfall. It had to be replaced as quickly as possible to protect the traveled road below from rockfalls and avalanches.

Description

Eberle Landschaftsbau und Geotechnik AG installed the four-meter high and 44-meter long Geobrugg special solution.

2024 the barrer was equipped with GUARD Monitoring devices to detect snow loads and rockfall.

Country/Region

Switzerland

Customer

Protected object

Road

Corrosion protection

Galvanized

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail