Suiza
Suiza

myGeobrugg

Protección contra caídas de rocas - Amden 2011

The bags are placed

Protección contra caídas de rocas - Amden 2011

Endangered area

Protección contra caídas de rocas - Amden 2011

The gallery is covered the damping system

Protección contra caídas de rocas - Amden 2011

Modules are delivered by helicopter directly on the gallery

 
 

Año de instalación:

2011

Situación

The Swiss National Road No. 17 between Weesen and Amden was endangered by stone and block striking. Between autumn 1978 and August 1981 the  Mattstock Gallery with a length of 110 meters and the Churfirsten Gallery with a length of 155 meters were created.

After various rockfall events and activities the danger situation of the whole street section was checked. The static calculation showed that the two galleries would only cover energies of 300 to max. 500 kJ as standard.

Based on a risk assessment, it was decided to fortify the two galleries for the scenario with a probability of a recovery period of 10 to 30 years with energies of 200 to 1'900 kJ.

Descripción

ROCKFALL-X G Damping system with cellular glass fill material and TECCO® mesh as protection for the rockfall galleries Mattstock and Churfirsten.

Modules: 1’300 pieces 1,3 m und 575 pieces 2,0 m heigh cellular glass filled ROCKFALL-X G damping modules.

Rockfall energies: 200 kJ to 1‘900 kJ.

País / Región

Suiza

Cliente

Tiefbauamt des Kantons St. Gallen, Abteilung Strassen- und Kunstbauten

Ingeniería:

Casutt Wyrsch Zwicky AG

Subcontratista:

Locher Bauunternehmer AG, Zürich, Switzerland

Objeto protegido

Carretera

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico