Suiza
Suiza

myGeobrugg

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

Shallow landslide barrier protecting the West Highland Line

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

Shallow landslide barrier and anchor

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

View of the SL-barrier, north end

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

Landslide barrier and brake ring

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

Solution to bottom support rope taut with foundation

Protección contra flujos de detritos y deslizamientos superficiales - Bridge of Orchy 2025

Barrier with the protected railway line underneath

 

Sistemas

 

Longitud del sistema

45 m

 

Año de instalación:

2025

Situación

In 2020, a significant landslide occurred on the West Highland Line, primarily caused by water runoff through the hillside. The landslide blocked the railway, forcing a full route closure while repairs were undertaken.

Given the ongoing risk posed by heavy and persistent rainfall, the site conditions were closely monitored. As part of the long-term protection strategy, a 45-metre SL-150 barrier was installed to mitigate the impact on the railway from further landslips.

Descripción

Working in collaboration with contractor QTS and designer Fairhurst, a 45-metre barrier solution was designed for Network Rail. Post spacing varies between 7 and 8 metres to suit the local topography.

We supported the project by supplying the barrier system and contributing technical input during the design and installation phases. Preserving the surrounding landscape was a key consideration; accordingly, the upslope anchor layout at the far end of the barrier was adapted to minimise environmental impact and reduce disruption during installation.

After the barrier installation, we carried out an in-house sign-off process called a CONSIS inspection to ensure the project met our rigorous quality and safety standards.

Network Rail made it clear that this sign-off was a critical part of the project’s delivery, reflecting their commitment to quality assurance and the successful delivery of the solution.

País / Región

Reino Unido

Cliente

Ingeniería:

Subcontratista:

QTS

Objeto protegido

Ferrocarril

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico