Protección contra flujos de detritos y deslizamientos superficiales - Bulli Pass (2) 2017

A 1,1 km long Shallow Landslide Barrier and seven Debris Flow Barriers are protecting the road at Bulli Pass in New South Wales.

Protección contra flujos de detritos y deslizamientos superficiales - Bulli Pass (2) 2017

Debris flow and shallow landslide barrier protecting Bulli Pass

 
 

Año de instalación:

2017

Situación

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Descripción

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX flood debris catchment nets.  The system now provides rock fall and landslide protection from a road that has 14'000 car movements a day.  The barrier is 3.5 m high including over 1'000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

País / Región

Australia

Cliente

Roads and Maritime Authority, New South Wales

Ingeniería:

Department of Public Works, (Project Management)

Subcontratista:

Specialised Geo Pty Ltd (GHD Contractor)

Subcontratista

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Objeto protegido

Carretera

Protección contra la corrosión

GEOBRUGG ULTRACOATING

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico