Protección contra caídas de rocas - La Roche-Blanche 2020

RXE-5000 ringnets protecting the village of La Roche-Blanche (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

RXE-5000, 6 meters high, 36 meters long in three fields (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

RXE-5000, 6 meters high, 84 meters long (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

View up to the unstable limestone rockface (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

View of the rockface and the RXE-5000 behind the houses, almost invisible (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

View of the RXE-5000 protecting the village of La Roche-Blanche (photo credit: Pierre-Yves Giraud, Géop)

Protección contra caídas de rocas - La Roche-Blanche 2020

View of the two fold protection systems (photo credit: Pierre-Yves Giraud, Géop)

 

Sistemas

 

Longitud del sistema

36 m - 84 m

 

Año de instalación:

2020

Situación

The rockfall problem at La Roche-Blanche came back to memory in Summer 2019 when large blocks detached from the limestone cliff above the village of La Roche-Blanche. They stopped in the nearest garden without causing much damage. Subsequently, the village ordered a survey of the rockface. The conclusion of this survey on the 22nd of December 2019 detailed the presence of a large fracture with the potential of imminent failure. A total of 1700 m³ was estimated to potential fail. It was decided to evacuate temporarily the residents living closest to the rockface, a tough decision to take just before Christmas.

Descripción

The authorities opted for a two-fold solution with a custom-made rockfall curtain just under the steep slope and a rockfall protection barrier RXE-5000 beneath it. 

The construction of the rockfall curtain had just been completed, and the posts of RXE-5000 set, when most of the unstable volume, 1500 m³, collapsed in mid-February. The rockfall curtain held back most of the material, nevertheless some parts of the ringnet barrier were damaged. After replacing parts, the installation was finally completed in March 2020.

País / Región

Francia

Ingeniería:

Subcontratista:

Objeto protegido

Edificio, Area residencial

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico