Suiza
Suiza

myGeobrugg

Estabilización de taludes - Palena 2003

.

Estabilización de taludes - Palena 2003

Details of the anchorage plate

Estabilización de taludes - Palena 2003

Details of the TECCO® mesh

Estabilización de taludes - Palena 2003

Location of the bank at the completion of works

Estabilización de taludes - Palena 2003

Stabilized bank with the TECCO® mesh

Estabilización de taludes - Palena 2003

Bank revegetation

Estabilización de taludes - Palena 2003

Details of the revegetated bank

Estabilización de taludes - Palena 2003

Condition of the bank after the flow surges

Estabilización de taludes - Palena 2003

System drawing

 

Año de instalación:

2003

Situación

The stretch of embankment in question was long since subject to erosion problems because of the presence of nonlinear stretches in correspondence with the material removal, in case of signifi cant fl ows. This involved problems of poor stability for the road above and for the buildings that were immediately behind.

Descripción

The TECCO® choice by the design engineer was made for various reasons of which we should mention the high-tensile steel wire TECCO® mesh unit (high tensile 1770 N/mm2); the special anticorrosive treatment with aluminium-zinc alloy (GEOBRUGG SUPERCOATING); and the high bearing resistance of the mesh, by applying tension to it with the penetration of the special TECCO® cuspate shaped plates for the distribution of the anchorage loads in the bank's soil. These elements guaranteed by the TECCO® System are not present in the traditional bank protection method with gabions. Furthermore, the
particularly fast timeline for the implementation of the TECCO® System played a major part given that the work was done late in the season.

País / Región

Italia

Cliente

Municipality of Palena

Ingeniería:

Dr. Ing. Alessandro Marini

Subcontratista:

CO.GE.PRI. srl - PIaneta Montagna

Objeto protegido

Carretera, Edificio

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Sistema de Monitoreo
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico