Before installing the safety net: the hall is open up to the ridge and the glass skylights; the suspended ceiling has no protective functions

Protección contra impactos - Production hall protection system 2019

Laterally fixed steel bars for fastening the safety net with the brakes

Protección contra impactos - Production hall protection system 2019

Delivery of the mesh rolls

Protección contra impactos - Production hall protection system 2019

Close-up: 2 of 160 brake boxes

Protección contra impactos - Production hall protection system 2019

The high-tensile steel wire mesh was rolled out using assembly belts. The panels were then connected with a seam rope.

Protección contra impactos - Production hall protection system 2019

The wire mesh allows the light to pass and protects the employees

 

Año de instalación:

2019

Situación

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Descripción

With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).

Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.

During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.

Dimensions

  •     6.5 meters wide
  •     80 meters long

País / Región

Alemania

Cliente

n.a.

Ingeniería:

Geobrugg

Subcontratista:

Stahlbau Schauenberg GmbH

Subcontratista

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Objeto protegido

Edificio, Infraestructura

Su contacto local

Ivo Naef
 

Ivo Naef

Director Industry Solutions

Protección contra impactos
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suiza Director Industry Solutions

Correo electrónico