Cacheuta Tunnel - Mendoza - Road N°82

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

General view of the stabilized slope: TECCO® G65/3 system and the 4 meters high dynamic barrier RXE-500

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

Drilling for the anchors (3.5 meters deep holes)

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

Installing the mesh at the prepared slope

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

In this section Rolled Cable Net QUAROX® and DELTAX® are installed

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

TECCO® system stabilizing the rockface

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

Assembly of the 4 meters high and 52 meters long rockfall barrier RXE-500

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

Completed RXE-500 rockfall barrier

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

View up the rockface - RXE-500 rockfall barrier

Laves torrentielles et coulées de boue - Cacheuta Tunnel - Mendoza - Road N°82 2020

Debris flow protection ring net VX060L, 4 meters high, 10 meters long

 
 

Longueur du système

10 m - 52 m

 

Année d’installation

2020

Situation

In a section of Route 82, near the entrance of the Cacheuta tunnel N°1, rocks frequently fell on the road. These and landslides represented a danger for the traffic.

Description

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 meters long
1b)  VX-060L: 4 meters high and 10 meters long
2)  RXE-500: 4 meters high and 24 meters long
3)  RXE-500 :4 meters high and 42 meters long

4)  972 m² Rolled Cable Net QUAROX® Plus DELTAX®
     774 m² TECCO® G65/3 grid 2x2
     847 m² DELTAX® G80/2

Pays / région

Argentine

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail