Suisse
Suisse

myGeobrugg

Tunsbergdalsdammen Access Control

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

The new access control fence

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

The old access control fence with an insufficient height of about 1 meter

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

The old fence clearly was not high enough

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

Overview on the water outlet channel with the slope above - a very popular spot for cross country skiing

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

The access control fence after installation

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

The new fence is a barrier for people; it also withstands heavy snow loads ...

Prévention des avalanches - Tunsbergdalsdammen Access Control 2017

... ideal for Geobrugg's multi hazard barrier

 

Systèmes

Solutions spéciales

 

Longueur du système

112 m

 

Année d’installation

2017

Situation

Statkraft Energi AS skal erstatte sikkerhetsgjerde rundt samlekanal sør for Tunsbergdalsdammen i Luster.

During wintertime, the slopes around Tunsbergdalsdammen Water Power Plant are very popular for cross-country skiing. To avoid injuries the Statkraft Energi AS had installed a simple fence around the water outlet channel. With a height of about a meter, the protection was not sufficient.

South of the Tunsbergdalsdammen in Luster the Statkraft Energi AS replaced the security fence around the joint channel. The new fence was designed to prevent people and skiers from falling into the water.

Description

For the fence, it was required not only to prevent people from falling into the channel but also to withstand snow loads of 2 meters.

Pays / région

Norvège

Client

Statkraft Energi AS

Ingénierie

NGI

Entrepreneur

Fjerby AS

Objet protégé

Infrastructure touristique, Infrastructure, Autres

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail