Protezione da caduta massi - Danielsberg 2019

The rockfall protection system after completion

Protezione da caduta massi - Danielsberg 2019

The infrastructure endangered by the rocks (top right in the picture)

Protezione da caduta massi - Danielsberg 2019

A crane places the huge posts onto the base plates

Protezione da caduta massi - Danielsberg 2019

All posts have been erected, afterwards the the suspension ropes get installed

Protezione da caduta massi - Danielsberg 2019

The 112 meter long barrier was realized with a support rope separation

Protezione da caduta massi - Danielsberg 2019

Once the transmission ropes have been installed, the nets are unfolded

Protezione da caduta massi - Danielsberg 2019

The buildings are located directly in the hazard zone

Protezione da caduta massi - Danielsberg 2019

The net bundles are hanging on the support rope, ready to unfold

Protezione da caduta massi - Danielsberg 2019

The ring nets are connected with shackles

Protezione da caduta massi - Danielsberg 2019

View from the east to the completed rockfall barrier

Protezione da caduta massi - Danielsberg 2019

Overview of the RXE-10000 system at Danielsberg

Protezione da caduta massi - Danielsberg 2019

The rockfall protection system after completion

 

Sistemi:

 

Lunghezza del sistema

- 112 m

 

Anno di installazione:

2019

Situazione

Buildings and the main road into the Mölltal (Danielsberg) were regularly affected by rockfall. During the planning of hazard zones, geological surveys also identified a substantial rockfall risk for the future. The expected rock falls require constructions that can absorb the highest energies.

Various solutions for protecting the infrastructure were considered. An earth dam, for example, was not an option due to the limited space available.

Video of the installation

Descrizione

Amongst the flexible rockfall barriers, only the Geobrugg RXE-10000 with an energy absorption capacity of over 10,000 kJ met the requirements in terms of energy absorption capacity. The area occupied by the barrier is relatively small.

This is the first rockfall protection project worldwide with a capacity of 10,000 kJ. The RXE-10000 system was certified in 2018.

Paese / Regione

Austria

Cliente

Wildbach- und Lawinenverbauung

Progettazione:

Wildbach- und Lawinenverbauung, IBG-ZT GmbH, Geobrugg

Contraente:

Wildbach- und Lawinenverbauung

Oggetto protetto

Strada, Costruzione, Zona residenziale, Infrastrutture

Protezione dalla corrosione

GEOBRUGG ULTRACOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail