Svizzera
Svizzera

myGeobrugg

Miniera / Gallerie - Hydropowerplant Chile I 2016

The barrier and the protected area

Miniera / Gallerie - Hydropowerplant Chile I 2016

During installation

Miniera / Gallerie - Hydropowerplant Chile I 2016

Final installation works

Miniera / Gallerie - Hydropowerplant Chile I 2016

Final installation works

Miniera / Gallerie - Hydropowerplant Chile I 2016

View on the protected tunnel entrance

Miniera / Gallerie - Hydropowerplant Chile I 2016

Lateral view on the RXE-1000 barrier

Miniera / Gallerie - Hydropowerplant Chile I 2016

Protected area, barrier in the background

 

Sistemi:

 

Anno di installazione:

2016

Situazione

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

Descrizione

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

Paese / Regione

Chile

Cliente

Proyecto hidroelectrico Alto Maipo

Progettazione:

Geotest

Contraente:

Incolur

Oggetto protetto

Costruzione, Cava / Miniera, Infrastrutture

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail