Production hall protection system

Protezione dagli impatti - Production hall protection system 2019

Completely installed safety net still with the yellow installation straps

Protezione dagli impatti - Production hall protection system 2019

Before installing the safety net: the hall is open up to the ridge and the glass skylights; the suspended ceiling has no protective functions

Protezione dagli impatti - Production hall protection system 2019

Laterally fixed steel bars for fastening the safety net with the brakes

Protezione dagli impatti - Production hall protection system 2019

Delivery of the mesh rolls

Protezione dagli impatti - Production hall protection system 2019

Close-up: 2 of 160 brake boxes

Protezione dagli impatti - Production hall protection system 2019

The high-tensile steel wire mesh was rolled out using assembly belts. The panels were then connected with a seam rope.

Protezione dagli impatti - Production hall protection system 2019

The wire mesh allows the light to pass and protects the employees

 

Anno di installazione:

2019

Situazione

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Descrizione

With a feasibility study we have proven the effectiveness of a protection system within a building (SMP Ingenieure im Bauwesen GmbH in Karlsruhe).

Stahlbau Schauenberg GmbH - supported by one of our assembly instructors - installed the system in the production hall.

During the installation of the nets, ropes and brake elements supplied by Geobrugg, our assembly technician supervised the assembly.

Dimensions

  •     6.5 meters wide
  •     80 meters long

Paese / Regione

Germania

Cliente

n.a.

Progettazione:

Geobrugg

Contraente:

Stahlbau Schauenberg GmbH

Subappaltatore

Due to the location of the hall (detonations in the vicinity possible), fall protection was necessary for the skylights. The requirements for a protective system resulted from the high weight and the expected impact.

Oggetto protetto

Costruzione, Infrastrutture

Il contatto locale

Ivo Naef
 

Ivo Naef

Director Industry Solutions

DPC per l’industria e l’edilizia
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Svizzera Director Industry Solutions

E-mail