スイス
スイス

myGeobrugg

Bassin d'Antiquailles - Tranchée rocheuse

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Stabilization of the rock face with the TECCO G65/3 system

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Anchors positioned in the cavities ensure proper tensioning of the mesh

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

Transition between the concrete frame and the stabilized slope

 - Bassin d'Antiquailles - Tranchée rocheuse 2022

The mesh adapts to different ground profiles, here rocky and loose areas

 
 

Year of installation

2022

Situation

In case of a big flood in the region, a trench was planned to allow the transfer of water to temporary storage (quarry).
The trench is partly equipped with a reinforced concrete framework, while a linear of about 60 meters remains in the open air and must be reinforced to avoid landslides

Geology

Calcaire

Description

The exposed rock face has fractured planes that can generate local instability. TECCO system, consisting of a G65/3 mesh associated with a P33 spike plate, was selected.
The resistance of the TECCO G65/3 mesh allowed us to propose a flexible-facing solution adapted to the site.

Country/Region

フランス

Engineering

Contractor

Protected object

インフラ

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail