 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Protected tunnel portal

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The rockfall barrier is unobtrusive, thus not disturbing the beautiful landscape

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Above the portal, posts are 7m tall

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

The protected portal below the barrier

 - Coquitlam-Bunzten Tunnel Gate Replacement 2021

Rapid and successful implementation through teamwork - thanks to all involved!

 

System length

42 m

 

Year of installation

2021

Situation

RXE-2000 barrier system needed to be installed to protect a tunnel portal, lay down area,  ventilation, and power sources. Barrier protects equipment as well as infrastructure. 

Description

Geobrugg delivered a 42m long, with 7m tall posts RXE-2000 Barrier at the end of December 2020. Project was completed, with great teamwork, January 2021.

Country/Region

カナダ

Customer

Engineering

Dr. Duncan Wyllie, P.Eng

Protected object

鉱山/採石場, インフラ, その他

Corrosion protection

亜鉛めっき, ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail