 - Embalse Chironta 2023

Attenuator ATT-40 from the side, along the road

 - Embalse Chironta 2023

The rockfall protection attenuator seen from the road

 - Embalse Chironta 2023

Posts height of the attenuator protection system is eight meters

 - Embalse Chironta 2023

General view of system location

 
 

System length

75 m

 

Year of installation

2023

Situation

Several rock cuts were made to construct this reservoir to obtain the necessary geometry for the reservoir and access roads. The generated slopes imply a challenge in terms of natural risks since they are mainly composed of fractured rock. It generated a series of low-energy and high-frequency landslides, which blocked the access roads, risking the operation of the reservoir.

Description

To solve these problems and mitigate risks on the most critical slopes, a rockfall attenuator (ATT-40) was installed. The attenuator mitigates low-energy rockfall from different small streams on the slope and guides them safely to the foot of the slope. In addition to the attenuator, a double curtain mesh (QUAROX, without picture) was installed in another sector of the reservoir’s access road.

Country/Region

チリ

Customer

Dirección de obras Hidráulicas del Ministerio de Obras Públicas

Protected object

道路, インフラ

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail