 - Gamsgrubenweg, Grossglockner 2013

Placement of the damping modules on top of the rockfall gallery. Elements size is 0.95 m x 0.95 m x 1.3 m

 - Gamsgrubenweg, Grossglockner 2013

Cross-section of the rockfall protection gallery for hikers with ROCKFALL-X G on top as extra dumping layer

 - Gamsgrubenweg, Grossglockner 2013

Big Bags and in between filling with cellular glass before covering with a geotextile

 - Gamsgrubenweg, Grossglockner 2013

Filling of the gaps between ROCKFALL-X G bags with cellular glass

 - Gamsgrubenweg, Grossglockner 2013

Cover with a geotextile

 

Systems

 

Year of installation

2013

Situation

To protect from rockfall on an alpine trail at the mountain Grossglockner in Austria, a new rockfall gallery was built between two tunnels.

Description

The damping system ROCKFALL-X G was used on top of the gallery to economically dampen rockfall impacts with a calculated energy of up to 800 kJ. For this purpose 85 bags of the 1.3 m high damping modules were prepared in Geobrugg factory and delivered directly to the construction site.

Country/Region

オーストリア

Customer

Grossglockner Hochalpenstrassen AG

Engineering

Ingenieurbüro Tschernutter Consulting GmbH

Contractor

Felbermayr Bau GmbH

Protected object

道路

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail