Two additional lines: one and two modules.

 - L'Hospitalet-près-l'Andorre 2021

The SPIDER® Dk 3.5 avalanche defense system is designed to withstand the expected snow heights

 - L'Hospitalet-près-l'Andorre 2021

The first line of 15.5 meters is composed of four modules in line

 - L'Hospitalet-près-l'Andorre 2021

Barrier line is located on a rugged slope

 
 

System length

8 m - 15 m

 

Year of installation

2021

Situation

The H24 chute which dominates the village of l'Hospitalet-près-l'Andorre is prone to avalanche departures as well as to rockfall which undermines avalanche control solutions.  

Description

We have provided a solution of tested avalanche barriers to catch falling rocks.
These systems are suitable for implementation in complex situations.

Country/Region

フランス

Engineering

RTM

Contractor

Protected object

居住区

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail