スイス
スイス

myGeobrugg

 - Los Bronces (2) 2014

.

 - Los Bronces (2) 2014

.

 - Los Bronces (2) 2014

.

 - Los Bronces (2) 2014

.

 - Los Bronces (2) 2014

.

 
 

System length

300 m - 300 m

 

Year of installation

2014

Situation

A new installation was built near a slope with a high avalanche potential. Protective measures were therefore necessary.

Description

The installed avalanche fences prevent the formation of avalanches.

Country/Region

チリ

Customer

Anglo American, Los Bronces

Engineering

Anglo American, Los Bronces

Contractor

Geobrugg Andina

Subcontractor

Geobrugg Iberica

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail