Site 1: VX100, 21 metres wide, 5 metres high debris flow barrier

 - Plimmerton 2023

Site 1: VX100, 21 metres wide, 5 metres high debris flow barrier - Blending into nature

 - Plimmerton 2023

Site 1: Geobrugg abrasion protection

 - Plimmerton 2023

Site 2: VX100, 15 metres wide, 5 metres high debris flow barrier - Blending into nature

 - Plimmerton 2023

Site 2: VX100, 15 metres wide, 5 metres high debris flow barrier

 - Plimmerton 2023

Site 3: VX100, 15 metres wide, 5 metres high debris flow barrier

 

Systems

 

Year of installation

2023

Situation

Three sites within the Karehana Bay Scenic Reserve located in Karehana Bay, Plimmerton, experienced debris flows following heavy rainfall on 29 November 2020. ENGEO completed an assessment of the three sites and concluded that a significant debris flow hazard is present and that mitigation solutions need to be implemented to reduce the risk to life safety to an acceptable level.

Description

Geobrugg VX100 debris flow barriers were installed at the three debris flow locations. The barriers are 5 metres high and have top rope spans of 15 to 21 metres. The system withstands impact pressures up to 100 kN per m²

A secondary mesh was used for aperture control. The high-tensile ring mesh and ropes cause minimal visual pollution and were constructed with minimal environmental pollution or disturbance.

The barriers are designed and tested according to EAD-340020-00-0106-Flexible kits for retaining debris flows and shallow landslides.

Country/Region

ニュージーランド

Customer

Porirua City Council

Engineering

ENGEO

Contractor

Geovert

Protected object

居住区

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail