Rest and be Thankful Catch Pits

 - Rest and be Thankful Catch Pits 2021

Final barrier above the newly cut catch pit

 - Rest and be Thankful Catch Pits 2021

View down through the old barrier showing the constrained space in the old catch pit.

 - Rest and be Thankful Catch Pits 2021

Looking up at the former SL150

 - Rest and be Thankful Catch Pits 2021

Final barrier above the newly cut catch pit

 

Systems

 

System length

90 m

 

Year of installation

2021

Situation

Following a re-appraisal of the existing landslide protection measures, it was determined that the existing SL-150 and catch pit were insufficient for the volumes and block energies expected in that area.

Description

Working with the geotechnical contractor Geo-Rope, their designer MHB and the client's framework design consultant drew up a solution with a large catch pit at the base of the slope and a customised Geobrugg barrier above the pit. The barrier was customised to have an “open” bottom, with a ring net drape being hung from the lower transmission ropes. The drape's function is to guide landslides and fallen blocks into the catch pit.

Country/Region

イギリス

Customer

Transport Scotland

Engineering

Contractor

Subcontractor

Protected object

道路

Corrosion protection

亜鉛めっき, ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail