 - Schänis, State Road 17 2016

Installation using a mobile drill rig

 - Schänis, State Road 17 2016

Installing a section towards south-east, before placing the spike plates

 - Schänis, State Road 17 2016

Protected object: Quiet during the day, very congested during rush-hour

 - Schänis, State Road 17 2016

Risk of toppling rocks is a thing of the past: SPIDER® ensures safe traffic (view of the north-eastern section)

 - Schänis, State Road 17 2016

Location: Linth Plain, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

Year of installation

2016

Situation

The area was formed by glaciers. With climate change, the rock underneath, molasse conglomerate rock, has become more unstable. During the past few years sections of rock, some with volumes of around 1 m³, became dangerously loose and were in danger of eminent fall onto the road, the building below and the neighboring pastures.

The Swiss State Agency for Forest and Natural Hazards immediately alerted the regional road inspectorate and political community to the potential risk.

Geology

Instable blocks of molasse conglomerate.

Description

As a short term emergency measure Geobrugg worked with the regional road administration and a local contractor to stabilize the most critical rock sections with SPIDER® S3-130.

As a long-term solution that ensures safe driving conditions for daily commuting, an anchored system was installed. Along the deep chasms all along the molasse bar, three levels of anchors were drilled. The higher and lower levels were drilled to a length of 4 m while the anchors of the middle rows were drilled to a length of 7 m. These anchors were drilled to a grid that measures 2.15 m x 2.15 m.

The whole project from planning to final acceptance took only six weeks.

Country/Region

スイス

Customer

State Department for Underground Construction, Canton St.Gallen, Switzerland

Engineering

Geobrugg AG, Geohazard Solution

Contractor

Oberholzer Inc., Neuhaus, Switzerland

Protected object

道路, 建築

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail