SPIDER mesh S3-130 prevents the historic building from collapsing

 - Slunj 2021

A slope stabilization system protects the historic landmark

 
 

Year of installation

2021

Situation

At the historical Slunj fortress, blocks of the limestone base collapsed. The ruins of Slunj were in danger.

Geology

Limestone

Description

The city of Slunj, the Croatian Government, and an EU fond were invested in rehabilitating the old fortress. It was stabilized with a concrete beam with nails then covered with a stone wall. Our part is the stabilization of the base of the fortress and the protection of people walking nearby. In a first step Spider S3-130 mesh with nails (32 mm, length 4 m) was installed. The protection of other areas of the slope with TECCO mesh G65/3 is planned.

Country/Region

クロアチア

Engineering

Protected object

観光用インフラ, アーキテクチャー

Corrosion protection

ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail