Trek route to Shri Mata Vaishno Devi Shrine (1)

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A rockfall barrier protecting pilgrims' route to Shri Mata Vaishno Devi Shrine

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Target of all pilgrims - Holy Cave located in the folds of the three peaked mountain named Trikuta

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Existing, stiff rockfall canopies were not able to withstand rockfalls existing along the trek and had to be extra protected by rockfall barriers

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Density of rockfalls was quite big, here smaller ones

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

The area was constantly endangered by rockfalls

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A and RXE-8000 rockfall barriers during installation - visible the route trek below, adjacent to steep rock face

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Installation of the RXE-8000 rockfall barrier in progress

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

RXE-8000 rockfall barrier after installation protecting the trek route below from the biggest rockfalls

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

RXE-5000 rockfall barrier after installation protecting the trek route below

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Closer look on GBE-3000A rockfall barrier after installation

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A after installation - visible smaller rockfalls already stopped by the barrier

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

Some areas required extra active slope stabilization using high-tensile steel wire mesh TECCO® G65/3 and QUAROX® net

 - Trek route to Shri Mata Vaishno Devi Shrine (1) 2016

GBE-3000A rockfall barriers protecting the route trek below, adjacent to steep rock face

 
 

System length

25 m - 110 m

 

Year of installation

2016

Situation

There had been several cases of rockfall and landslides in the trek route of the Holy Shrine of Mata Vaishno Devi. Therefore, the Shrine Board decided to actively stabilize the 75º and higher steep slope, up to a maximum height of 70 m in this section. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

Description

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which match the load capacity of the mesh serve to fix the mesh to soil or rock nails. By tensioning these nails, and recessing the spike plates into the ground, the mesh is adequately tensioned to ensure it follows the surface contours.

Based on the survey results, the authorities also decided to apply a rockfall protection barriers from Geobrugg. With its ring nets made of high-tensile steel wire the barrier design has been tested and approved to absorb impact energies of up to 8000 kJ. A total number of 15 barriers were installed in different locations with energy absorption capacity ranging from 3000 kJ up to 8000 kJ.

See also our slope project Trek route to Shri Mata Vaishno Devi Shrine (2)

Country/Region

インド

Customer

Shri Mata Vaishno Devi Shrine Board

Engineering

Tehri Hydro Development Corporation Ltd

Contractor

Pioneer Foundation Engineers Pvt Ltd

Protected object

道路, 建築, 観光用インフラ, インフラ, アーキテクチャー, その他

Corrosion protection

亜鉛めっき, ジェオブルッグ スーパーコーティング

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

E-Mail