스위스
스위스

myGeobrugg

낙석방호시스템 - Industrial Road km 21 2023

General view of the rock fall barrier installed

낙석방호시스템 - Industrial Road km 21 2023

Drilling process of the retention anchors

낙석방호시스템 - Industrial Road km 21 2023

Installation of the post on top of the base plate

낙석방호시스템 - Industrial Road km 21 2023

View of all the post installed

낙석방호시스템 - Industrial Road km 21 2023

ROCCO ring net down slope

낙석방호시스템 - Industrial Road km 21 2023

ROCCO ring net taken down slope of the barrier

낙석방호시스템 - Industrial Road km 21 2023

Side view of the installed barrier

 

Systems

 

시스템 길이

- 60 m

 

설치 년도

2023

Situation

The channel that transports copper concentrate was exposed to possible rockfalls from a farellon. The breakage of this infrastructure would have great economic and environmental consequences. To mitigate this problem, a project that includes a rock fall barrier was developed. 

Description

In order to protect this critical infrastructure, a dynamic barrier with a capacity of  3,000 kJ of energy absorption, 7 meters high and 60 meters long was installed.

Country/Region

칠레

Customer

Engineering

Protected object

Mine / Quarry

부식방지

Galvanized, GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일