스위스
스위스

myGeobrugg

Oštarije-Gospić-Knin-Split, Railway M604

낙석방호시스템 - Oštarije-Gospić-Knin-Split, Railway M604 2025

The protected railway line near Trogir

낙석방호시스템 - Oštarije-Gospić-Knin-Split, Railway M604 2025

Overview rockfall protection

낙석방호시스템 - Oštarije-Gospić-Knin-Split, Railway M604 2025

Slope stabilization and rockfall protection combined at the crucial point

낙석방호시스템 - Oštarije-Gospić-Knin-Split, Railway M604 2025

Inspection of the safety installations holding back rockfall and preventing it; the rockfall barrier is four meters high

 
 

시스템 길이

330 m

 

설치 년도

2025

Situation

Frequent rockfalls on this vital traffic link between Dalmatia and the rest of the country often caused delays.

Description

An active stabilization with TECCO® G65/3 and a GBE-500A rockfall protection barrier considerably enhance the safety of the railway line. 

Country/Region

크로아티아

Contractor

Protected object

Railway

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일