스위스
스위스

myGeobrugg

Puy-Sanières, Versant de Villaret

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Unstable zone before the slope was stabilized

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope covered with mesh and erosion control mat

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Tunnel portal with the stabilized slopes

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 flexible panel with P33 claw plates

비탈면 보강 시스템 - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 junction with TECCO G65/4 and TECMAT

 
 

설치 년도

2024

Situation

The exceptionally bad weather at the end of 2023 weakened the earthwork on the Villaret slope. As a result, train traffic was interrupted and then restricted for several months, and the Villaret slope had to undergo major reinforcement work.

Description

A nailed wall with a flexible facing reinforced the unstable overburden zone above the tunnel head. The structure combines more than 400 anchors with diameters of 28 mm and 32 mm, with depths ranging from three to twelve meters, and a flexible facing consisting of around 3,700 m² of TECCO mesh, supplemented by a TECMAT anti-erosion geogrid. In addition, two drainage groins were installed directly in the reprofiled ground before the mesh was put in place to drain the water resurgence observed at the top of the slope.

The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Villaret slope since December 2023 ended in July 2024 before the summer season started.

Country/Region

프랑스

Customer

Engineering

SNCF Réseau

Contractor

Protected object

Railway

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일