Hydroelectric Power Station Schattenhalb 1+

낙석방호시스템 - Hydroelectric Power Station Schattenhalb 1+ 2016

Overview of the installation site - visible the building endangered by rockfalls

낙석방호시스템 - Hydroelectric Power Station Schattenhalb 1+ 2016

ROCKFALL-X A system during installation (all materials were transported by a helicopter) - visible old tires positioning

 

Systems

 

시스템 길이

7 m - 10 m

 

설치 년도

2016

Situation

The builiding of the Hydroelectric Power Station Schattenhalb 1+ placed underneath the Reichenbach waterfalls, was endangered by regular rockfalls.

Description

In order to protect the building against rockfall, the roof had to be re-dimensioned and strengthened. The damping system ROCKFALL-X A (including old tires as dumping elements) was used for the economical protection against rockfalls with an expected energy up to 700 kJ on the 70 m² roof area.

Country/Region

스위스

Customer

BKW AG

Engineering

Ghelma Spezialtiefbau AG

Contractor

Ghelma Spezialtiefbau AG

Protected object

Building, Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일