스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Cwmavon Landslide 2018

Completed site image from the south of site.

비탈면 보강 시스템 - Cwmavon Landslide 2018

Slope after failure and cleaning

비탈면 보강 시스템 - Cwmavon Landslide 2018

Site after tree clearance

비탈면 보강 시스템 - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

비탈면 보강 시스템 - Cwmavon Landslide 2018

Skid drill rig installing soil nails

비탈면 보강 시스템 - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

비탈면 보강 시스템 - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

비탈면 보강 시스템 - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

비탈면 보강 시스템 - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 
 

설치 년도

2018

Situation

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geology

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Description

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Country/Region

영국

Customer

Neath Port Talbot county borough council

Engineering

Remedy Geotechnics

Contractor

Quantum Geotechnical

Subcontractor

iBEX technical access

Protected object

Road, Residential area, Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일