스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Tengen K6132 2020

Visible overhang, a lot of loose material had to be removed by hand

비탈면 보강 시스템 - Tengen K6132 2020

Situation after clearing and before erection of protective structures; the overhang partly with roots and loose stones

비탈면 보강 시스템 - Tengen K6132 2020

The same area now covered by TECMAT® with nail grid below the slope overhang

비탈면 보강 시스템 - Tengen K6132 2020

After installation of TECMAT® erosion control mat and TECCO® mesh

 
 

설치 년도

2020

Situation

Frequent rockfall posed a risk to the district road K6132 between Uttenhofen and Tengen near the Swiss border. In this area, trees are under special protection and rare animals like the red kite nest here.

Description

Seven installations of TECCO® G65/3 and TECMAT® secure the overhanging structure of the slope today. Also, a 2 meters high gap-filling solution was erected on a rock outcrop. The protected slope heights are between 4 and 18.5 meters. A total of about 5,000 m² of TECCO® were installed.

Country/Region

독일

Contractor

Protected object

Road

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
모니터링
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일