Estabilização de taludes - Cucuta Pamplona Hill 2015

Combination with active anchors

Estabilização de taludes - Cucuta Pamplona Hill 2015

Lateral view of the solution

Estabilização de taludes - Cucuta Pamplona Hill 2015

Combination with active anchors

Estabilização de taludes - Cucuta Pamplona Hill 2015

Front view of the slope

Estabilização de taludes - Cucuta Pamplona Hill 2015

Greening process

 
 

Ano de instalação:

2015

Situação:

The three critical slopes in the area of Cúcuta - Pamplona measure over 120 meters in height.


Descrição:

The San Simón concession (the companies Fondo de Adaptacion and Latinoamericana de Construcciones), decided to implement 2'5000 m² of DELTAX and 4'725 m² of TECCO G65/3.

The mesh system was accompanied by an erosion control mantle covering in some cases active anchors that are installed to guarantee the global stability of the critical site.

País / Região:

Colômbia

Cliente:

Fondo de Adaptacion

Contratante:

Concesion San Simon

Subcontratado:

Latinoamericana de construcciones

Objecto protegido:

Estrada

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail