Suíça
Suíça

myGeobrugg

Estabilização de taludes - Dawlish Central Tunnels 2024

Overhead view of the protected railway line and tunnel

Estabilização de taludes - Dawlish Central Tunnels 2024

Slope stabilization work is in progress at Dawlish Central Tunnels. TECCO® G65/3 Stainless mesh has been installed to prevent rockfalls and soil erosion.

Estabilização de taludes - Dawlish Central Tunnels 2024

View of the steep slope above the railway tunnel showing how the TECCO System seamlessly blended with the surroundings.

Estabilização de taludes - Dawlish Central Tunnels 2024

Train passing through the tunnel with installed TECCO® STAINLESS mesh ensuring long-term slope stability and safety.

Estabilização de taludes - Dawlish Central Tunnels 2024

Completed slope stabilization project

 
 

Ano de instalação:

2024

Situação:

Over the years, the slopes above the railway between Dawlish and Holcombe have experienced continuous failures, causing significant delays, closures, and operational challenges. 

The project aimed to address these challenges by combining multiple work areas to create a cohesive and effective protective system.

Descrição:

To ensure the stability of the slopes above the railway, we collaborated with Tony Gee and Partners to develop a robust and durable solution. The solution involved installing TECCO® G65/3 Stainless Steel mesh, known for its exceptional resistance to corrosion — a crucial factor given the challenging coastal environment of South West England.

Designed to provide protection for over 120 years, this system offers long-term security for the rail infrastructure. By utilizing compliant P33/50 and P66/50 stainless steel spike plates, Tony Gee and Partners were able to precisely model and design the stabilization system using our specialized RUVOLUM® software. This approach ensured optimal placement and performance, safeguarding the railway for future generations.

País / Região:

Reino Unido

Cliente:

Engenharia:

Contratante:

BAM

Subcontratado:

Objecto protegido:

Caminho de ferro

Protecção contra a corrosão:

INOX / STAINLESS

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail