Suíça
Suíça

myGeobrugg

Proteção contra desprendimentos - Gföller Brücke, Val d’Ega 2014

Overview over the Gföller-Bridge with extra latticework, the ROCKFALL-X G system on top and the rockface in the background

Proteção contra desprendimentos - Gföller Brücke, Val d’Ega 2014

Moving of the ROCKFALL-X G damping modules using a crane

Proteção contra desprendimentos - Gföller Brücke, Val d’Ega 2014

Bags of various heights of 1.0 m, 1.5 m and 2.0 m during installation - visible height dependent arrangement

Proteção contra desprendimentos - Gföller Brücke, Val d’Ega 2014

Eventual empty spaces are fiiled with cellular glass in order to prevent any unnecessary movements

Proteção contra desprendimentos - Gföller Brücke, Val d’Ega 2014

A layer of topsoil, with a lining of erosion-resistant jute sheet, was installed over the ROCKFALL-X G damping modules and then hydroseeded. Visible final solution appearance

 

Sistemas:

 

Comprimento do sistema:

20 m - 40 m

 

Ano de instalação:

2014

Situação:

The gallery between two stretches of tunnels is exposed to rockfall. The concrete deck risked to be damaged by severe events.

Descrição:

To secure the bridge from rockfall energies up to 2300 kJ, a gallery roof construction was built above the street-stretch between the two tunnels. To reduce the risk further, the gallery-roof was secured by the ROCKFALL-X G damping system. A protection system which works by absorbing kinetic energy, thereby limiting deformation and above all limiting the pressure exerted on the deck by spreading loads over a wide area, while limiting the weight on the gallery so as not to overburden it.

556 preassembled ROCKFALL-X G big bags were delivered and installed during May and June 2014 in the following configuration:

  • 109 pcs. - 1.0 m high
  • 99 pcs. - 1.5 m high
  • 348 pcs - 2.0 m high

País / Região:

Itália

Cliente:

Provinz Bozen

Engenharia:

PPS Group, Bozen

Contratante:

Max Bögl

Objecto protegido:

Estrada

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail