Suíça
Suíça

myGeobrugg

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

The barrier and the protected area

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

During installation

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

Final installation works

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

Final installation works

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

View on the protected tunnel entrance

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

Lateral view on the RXE-1000 barrier

Proteção contra desprendimentos - Hydropowerplant Chile I 2016

Protected area, barrier in the background

 

Sistemas:

 

Comprimento do sistema:

120 m

 

Ano de instalação:

2016

Situação:

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

Descrição:

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

País / Região:

Chile

Cliente:

Proyecto hidroelectrico Alto Maipo

Engenharia:

Geotest

Contratante:

Incolur

Objecto protegido:

Edifício, Pedreira/ Minas, Infra-estrutura

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail