Suíça
Suíça

myGeobrugg

Prevenção de avalanches - L'Hospitalet-près-l'Andorre 2021

Two additional lines: one and two modules.

Prevenção de avalanches - L'Hospitalet-près-l'Andorre 2021

The SPIDER® Dk 3.5 avalanche defense system is designed to withstand the expected snow heights

Prevenção de avalanches - L'Hospitalet-près-l'Andorre 2021

The first line of 15.5 meters is composed of four modules in line

Prevenção de avalanches - L'Hospitalet-près-l'Andorre 2021

Barrier line is located on a rugged slope

 
 

Comprimento do sistema:

8 m - 15 m

 

Ano de instalação:

2021

Situação:

The H24 chute which dominates the village of l'Hospitalet-près-l'Andorre is prone to avalanche departures as well as to rockfall which undermines avalanche control solutions.  

Descrição:

We have provided a solution of tested avalanche barriers to catch falling rocks.
These systems are suitable for implementation in complex situations.

País / Região:

França

Engenharia:

RTM

Contratante:

Objecto protegido:

Área residencial

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail