Suíça
Suíça

myGeobrugg

L'Hospitalet-près-l'Andorre - Temporary Shoring

Estabilização de taludes - L'Hospitalet-près-l'Andorre - Temporary Shoring 2024

Project overview with temporary shoring

Estabilização de taludes - L'Hospitalet-près-l'Andorre - Temporary Shoring 2024

TECCO mesh replaces concrete cladding and is covered by French norm NF P 94-270.

Estabilização de taludes - L'Hospitalet-près-l'Andorre - Temporary Shoring 2024

In a very short time, a 1.2-meter-thick invert partly backfilled the temporary support. In the end, the underpinning will be completely covered behind the concrete cap.

Estabilização de taludes - L'Hospitalet-près-l'Andorre - Temporary Shoring 2024

145 meters of mesh will help to temporarily stabilize the bedrock for the construction of the civil engineering structure.

Estabilização de taludes - L'Hospitalet-près-l'Andorre - Temporary Shoring 2024

During the winter when the civil engineering work is carried out, the TECCO maintains its stabilizing role.

 

Sistemas:

 

Ano de instalação:

2024

Situação:

The main access to Andorra via the Ariège is the RN320, which is in a prime avalanche corridor at L’Hospitalet-près-l’Andorre. To secure this access, the South-West National Road Authority opted for a 300-meter-long concrete tunnel. This civil engineering structure requires the construction of a nailed wall to free up the inverted right-of-way.

Descrição:

We supported Botte Fondation’s response to the call for tenders by varying the provisional concrete nailed wall over a linear stretch of 145 meters with TECCO flexible facing. With this variant, a temporary shoring, in addition to saving time and the management of the shotcrete, the company was able to avoid placing 100 m³ of concrete while guaranteeing the perfect behavior of the structure.

País / Região:

França

Cliente:

DIRSO

Engenharia:

ARCADIS

Contratante:

BOTTE FONDATIONS

Objecto protegido:

Estrada

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail