Meckenbeuren dam protection against badger

Engenharia Hidráulica - Meckenbeuren dam protection against badger 2022

Railway dam protected against badgers and other borrowing animals.

Engenharia Hidráulica - Meckenbeuren dam protection against badger 2022

Badger den entrance before the measures. The den entrance is below the railway and has a diameter of around 30 cm.

Engenharia Hidráulica - Meckenbeuren dam protection against badger 2022

Installation of the mesh. Not visible in the picture: In a final step, the mesh was laid in the previously excavated trench, anchored in the ground and then covered over.

Engenharia Hidráulica - Meckenbeuren dam protection against badger 2022

Fixation of the mesh with soil nails and ground anchors

 

Sistemas:

 

Ano de instalação:

2022

Situação:

At the railway embankment (DB line 4500, Meckenbeuren - Kehlen, railway km 189.5+45 to km 190.1+15), measures against badger infestation and the resulting undermining and subsidence had become necessary. In the past, the tracks had already been displaced due to undermining caused by the burrowing of badgers in the railway dam.

Both sides of the embankment had to be protected from future damages.

Descrição:

After the existing badgers had been deterred, Geobrugg provided 11´500 m² of TECCO G45/2 to protect the railway against badgers and other borrowing animals. To make sure no badger was trapped inside their den, the mesh was first cut out at the den entrances to ensure the getaway. These openings were provided with a flap to prevent animals from getting back inside the dam. After a few months, the dens were filled with soil and sealed with the TECCO mesh. 

País / Região:

Alemanha

Cliente:

DB Netz AG

Contratante:

Objecto protegido:

Caminho de ferro

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Felix Nowak
 

Felix Nowak

Engenharia Hidráulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail