Suíça
Suíça

myGeobrugg

Monitoring - Mellitz 2021

Installation of Geobrugg GUARD on the top support rope with a torque wrench

Monitoring - Mellitz 2021

Rockfall barrier, view from behind

Monitoring - Mellitz 2021

Snowloads measured during winter 2020/2021

 
 

Ano de instalação:

2021

Situação:

The road has been protected for years by rockfall barriers RXI-200. Due to the high snowfall in this region, the Geobrugg GUARDs were installed for test purposes. The aim was to confirm that the Geobrugg GUARD also measures the slowly increasing snow load.

Descrição:

To guarantee constant monitoring, three Geobrugg GUARD devices were installed:

  • With an acceleration sensor, larger rock impacts can be detected.
  • The force measurement measures the slow filling of the fence. This enables measuring the snow load in the winter months.
  • Furthermore, a corrosion sensor records the corrosion at this specific location, classifies it, and calculates the material service life.

País / Região:

Áustria

Cliente:

BBA Lienz

Contratante:

Felbermayr

Objecto protegido:

Estrada

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail