Estabilização de taludes - Northchurch 2023

View westwards towards the tunnel portal

Estabilização de taludes - Northchurch 2023

View of final installation

Estabilização de taludes - Northchurch 2023

View from rope access

 

Sistemas:

 

Ano de instalação:

2023

Situação:

Slopes above a railway tunnel portal in Northchurch, Berkhamsted, had shown signs of instability. As part of the West Coast Main Line, this railway is a critical piece of infrastructure for both passengers and freight trains alike.

Tony Gee & Partners Consulting Engineers acted as the designers for the remediation of the ongoing slope instability, whilst BAM Ritchies were the contractors appointed to install the final solution.

Geologia

Holywell Nodular Chalk Formation and New Pit Chalk Formation

Descrição:

The chosen design involved a rock-bolted solution of R-32 hollow bar between 8 - 10 meters long with over 730 rock bolts used across the site, which spanned from above the tunnel portal around to the northern side of the cutting and then eastwards.

TECCO G45/2 was chosen as the right facing to stabilize the superficial instability.
BAM Ritchies used rope access techniques to install erosion control matting first, followed by TECCO G45/2.

Geobrugg worked with Tony Gee & BAM Ritchies to ensure design and installation of the TECCO system was appropriate and simple.

País / Região:

Reino Unido

Cliente:

Engenharia:

Contratante:

Objecto protegido:

Caminho de ferro, Área residencial

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail