Suíça
Suíça

myGeobrugg

Réotier, Versant de Mensolles

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide barrier

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Before installation of the protecting solution

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide (SL-150) barrier

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Overall view of SL-150 barrier

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

During installation of the SL-150 barrier

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Detail of the Low water channel made of blocks set in concrete

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Detail of a foundation block at the foot of a post

Proteção contra correntes de detritos - Réotier, Versant de Mensolles 2024

Detail of an end post

 

Sistemas:

 

Comprimento do sistema:

42 m

 

Ano de instalação:

2024

Situação:

Following an exceptional rainfall event in November 2023, a mudslide mobilizing a volume of around 600 to 800 m³ reached and covered the rail track over a distance of more than 30 meters. As a result of this event, the railway line was interrupted and restricted for several months. The Mensolles slope had to be secured against the residual volumes of material that could potentially be remobilized following the event.

Descrição:

Geobrugg assisted the SNCF with the design and supervision of a 42-meter-long mudflow barrier.

The central part of the barrier was completed by a wide masonry ditch to channel the flow of almost permanent runoff water to a hydraulic structure at the track level.


The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Mensolles slope since December 2023 were withdrawn early in July 2024 before the summer season.

País / Região:

França

Cliente:

Engenharia:

SNCF Réseau

Contratante:

Objecto protegido:

Caminho de ferro

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail