Suíça
Suíça

myGeobrugg

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal, Line 1 (60 m SL150)

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

Engineering study

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

General view, South Sector

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal Line (60 m SL150)

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

South Portal line 2 (114 m SL150)

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 1

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, South Portal line 2

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

General view, north sector

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

First works North Portal

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

Work in progress, North Portal

Proteção contra correntes de detritos - San Francisco Tunnel Los Bronces Access Protection 2018

North Portal barrier (66 m, SL150)

 

Sistemas:

 

Comprimento do sistema:

- 240 m

 

Ano de instalação:

2018

Situação:

The San Francisco River is one of the main tributaries of the Mapocho River that crosses the city of Santiago. This river originates and passes the surroundings of the mining site Los Bronces de Anglo American, located in the middle of the Andes Mountain Range. Within its route, the river crosses a tunnel that makes a bypass through the old tailings pond of the mining site.

In summer, this sector is prone to rainfall, producing landslides that block the entrance and exit portals of the tunnel, affecting the riverbed and generating a significant environmental impact when it comes into contact with the tailings pond material.

Descrição:

To protect the portals, a long-term plan has been designed. It begins with mitigation works for the landslides that occurred in the vicinity of the portal. For this purpose, an engineering project was initially developed to model the water flows in the streams and then implement a solution with multiple shallow landslide barriers protecting both portals of the tunnel. The barriers will avoid future environmental impacts due to the diversion of the river waters.

País / Região:

Chile

Cliente:

Anglo American - Los Bronces

Engenharia:

Geotest

Contratante:

Pucará

Objecto protegido:

Pedreira/ Minas, Infra-estrutura, Outros

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail