Estabilização de taludes - Tengen K6132 2020

Visible overhang, a lot of loose material had to be removed by hand

Estabilização de taludes - Tengen K6132 2020

Situation after clearing and before erection of protective structures; the overhang partly with roots and loose stones

Estabilização de taludes - Tengen K6132 2020

The same area now covered by TECMAT® with nail grid below the slope overhang

Estabilização de taludes - Tengen K6132 2020

After installation of TECMAT® erosion control mat and TECCO® mesh

 
 

Ano de instalação:

2020

Situação:

Frequent rockfall posed a risk to the district road K6132 between Uttenhofen and Tengen near the Swiss border. In this area, trees are under special protection and rare animals like the red kite nest here.

Descrição:

Seven installations of TECCO® G65/3 and TECMAT® secure the overhanging structure of the slope today. Also, a 2 meters high gap-filling solution was erected on a rock outcrop. The protected slope heights are between 4 and 18.5 meters. A total of about 5,000 m² of TECCO® were installed.

País / Região:

Alemanha

Contratante:

Objecto protegido:

Estrada

Protecção contra a corrosão:

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail