Швейцария
Швейцария

myGeobrugg

Kaikoura State Highway (SR27) / Coastal Pacific Rail (NS15)

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking North SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking South SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking North SH1 - SL-150 with transmission rope protecting the road and rail corridor

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking South SH1 - SL-150 with transmission rope protecting the road and rail corridor

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Note the Barrier is built on top of a culvert to contain the debris material in the event of overtopping

Селевые потоки и микросели - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Slip 8, looking West and North SH1 - SL-150 protecting the road rail corridor

 

Системы:

 

Длина системы:

24 m - 126 m

 

Год установки:

2019

Ситуация:

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura township. Initially, more than 40 major slips inundated the road and rail with >750,000 m³ of material from source zones up to 500 metres above sea level. The loosened highly fractured Grey Wacke has caused subsequent frequent rockfalls, shallow landslides and debris loads.

The increased hazard associated with the frequent failures created a requirement to install shallow landslide barriers on several open slope locations to be able to maintain the SH1 road and Railway below. The major design constraint for the sites was minimising the deflection of the barrier in both rockfall and debris load events.

Описание:

The 3.5m high SL-150 barrier was selected due to its 150kN/m² load capacity with low defection (<2.2 metres in a debris load event) and due to it being the only tested and certified landslide barrier. To lower the deflection further for the maximum energy level (MEL) rockfall event, a custom transmission rope was designed and installed. The lower deflection was required due to the barriers close proximity to the railway.

To date, six SL-150s ranging from 24 metres to 126 metres long have been installed in the Kaikoura region with three of them having an additional transmission rope.

Страна/Регион:

Новая Зеландия

Клиент:

NCTIR / NZTA / KiwiRail

Подрядчик:

Geovert, SRG, HGS, Ground Anchor Systems and Geotech

Защищаемый объект:

Дорога, Железнодорожная линия

Защита от коррозии:

GEOBRUGG ULTRACOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта