Швейцария
Швейцария

myGeobrugg

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

The DELTAX® mesh being placed and secured, anchors and bottom rope visible

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

Transport berm in the open-pit mine with protective posts along the slope

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

The client’s drilling machine in operation during anchor installation on the steep rock face

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

Wide view of the mine with transport roads and haul trucks in operation

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

View of the berm after installation, safe passage for mine operations

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

Steep quarry slope with visible geological layers and instabilities

Камнепады, обвалы, осыпи - Pustynnoye Mine 2024

Measurement of rock block behind the mesh after rockfall event

 

Системы:

Специальные решения

 

Год установки:

2024

Ситуация:

The mining company Altynalmas requested Geobrugg’s support to protect a transport berm in their open-pit mine. Rockfalls from a 100-meter slope posed a serious risk to the entire operation. The following challenges were identified:

  • Berms filled with blasted rock mass from overlying horizons

  • Bulges on the slope with risk of detachment

  • Complex geological structure with a syncline and potential failures such as wedge breaks and backward toppling

Additionally, the client struggled to find a contractor to install rock nails in the remote location. Geobrugg was therefore asked to propose a protection system that could be installed with the client’s own workforce and machinery.

Описание:

Geobrugg experts assessed the hazardous zones and evaluated different protection options, including the active stabilization system TECCO®, a GBE rockfall barrier, and a drape system with DELTAX® 80/3 mesh. Since there was not enough space to install a barrier and the TECCO® solution would have been too costly for the 100-meter slope—which was not yet in its final contour—the drape system was selected as the most suitable option.

The system was modified with a bottom rope fixed by anchors, as there was no trench or space available to catch falling rocks. Although this increased the load on the system, it was considered the best solution for the road's limited operational period. Geobrugg also advised the mine on drilling and installing anchors using the blasting machine.

A few days after installation, a rockfall of 53 m³ (140 tons, maximum block size 1.45 m) occurred, affecting around 20 meters of the road. The system successfully contained the mass, allowing operations to continue. Thanks to its durability, the DELTAX® 80/3 mesh was later dismantled and reused in another section of the mine, with some parts repurposed for a barrier developed by the mine itself.

Страна/Регион:

Казахстан

Клиент:

Защищаемый объект:

Дорога, Kарьер / Шахта

Защита от коррозии:

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта