Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope

Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Unstable zone before the slope was stabilized

Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Overall view of the slope covered with mesh and erosion control mat

Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Tunnel portal with the stabilized slopes

Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 flexible panel with P33 claw plates

Укрепление склонов - Puy-Sanières, Versant de Villaret 2024

Detail of TECCO GREEN G65/3 junction with TECCO G65/4 and TECMAT

 
 

Год установки:

2024

Ситуация:

The exceptionally bad weather at the end of 2023 weakened the earthwork on the Villaret slope. As a result, train traffic was interrupted and then restricted for several months, and the Villaret slope had to undergo major reinforcement work.

Описание:

A nailed wall with a flexible facing reinforced the unstable overburden zone above the tunnel head. The structure combines more than 400 anchors with diameters of 28 mm and 32 mm, with depths ranging from three to twelve meters, and a flexible facing consisting of around 3,700 m² of TECCO mesh, supplemented by a TECMAT anti-erosion geogrid. In addition, two drainage groins were installed directly in the reprofiled ground before the mesh was put in place to drain the water resurgence observed at the top of the slope.

The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Villaret slope since December 2023 ended in July 2024 before the summer season started.

Страна/Регион:

Франция

Клиент:

Проектировщик:

SNCF Réseau

Подрядчик:

Защищаемый объект:

Железнодорожная линия

Защита от коррозии:

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

René Müller
   

René Müller

Country Manager Western Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Western Switzerland

Электронная почта

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Геобругг АГ Project Manager Sales Eastern and Central Switzerland

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Швейцария Country Manager Southern Switzerland

Электронная почта