瑞士
瑞士

myGeobrugg

Banya railway line protection

边坡稳定 - Banya railway line protection 2008

.

边坡稳定 - Banya railway line protection 2008

.

边坡稳定 - Banya railway line protection 2008

.

 
 

安装年份:

2008

情况:

-

描述

TECCO® System Drape as a protection measure for guided rockfall behind the mesh drape

国家/地区

保加利亚

客户

-

防护对象

Railway

腐蚀保护:

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址